0

Out of 0 Ratings

Owner's of the DCS Patio Heater DRH-48N gave it a score of 0 out of 5. Here's how the scores stacked up:
  • Reliability

    0 out of 5
  • Durability

    0 out of 5
  • Maintenance

    0 out of 5
  • Performance

    0 out of 5
  • Ease of Use

    0 out of 5
of 44
 
13
INSTALLATION
Important!
VENTILATION
A minimum building ventilation rate of 4 CFM per 1,000 BTU’s of installed heater input must be provided.
This rate of ventilation may be obtained through either gravity or mechanical ventilation of the building. In
conjunction with building ventilation system, adequate fresh air into the building must be provided through
fresh air inlets and/or building inlets. It is recommended local code be checked to assure the ventilation
system and heat installation are in compliance with local and/or state codes.
When checking for gas leaks, do not use an open flame. Use a soap and water solution.
Note:
Gas connections on the heater are leak tested at the factory prior to shipment.
WARNING!
Periodically check the whole gas system for leaks or immediately check if the smell of gas is detected.
Extinguish all open flames.
Never leak test while smoking.
Do not use heater until all connections have been leak tested and do not leak.
When leak testing, refer to the connections diagrams.
Only those parts recommended by the manufacturer should be used.
Substitution can void warranty.
LEAK TEST:
Make a soap solution of one part liquid detergent, and one
part water. The soap solution can be applied with a spray
bottle, brush or rag. Soap bubbles will appear where a leak is
present.
Turn the gas supply ON” check for leaks at leak points. If a
leak is present, turn off supply, tighten any leaking fittings,
turn gas on and recheck.
Note:
There is a manual shut-off lever on the internal heater control
valve/regulator. This lever is shipped in the “ON” position -
Fig. 02 (Default position).
"ON" POSITION
FACTORY DEFAU LT
"OFF"
F
ig
. 02